WIRING CONNECTION

WARNING !
UPS installation and connection must be performed by a GE Service Technician only.
Refer to the "Safety prescriptions - Installation" described on Chapter 1.
In case of UPS equipped with options or customized parts not covered by this
manual, please consult the appropriate technical documentation before proceeding
with electrical connections.
Carefully read the following recommendations before proceeding:
Ensure that the AC and DC external isolators are Off, and prevent their inadverted operation.
Do not close any external isolators prior to the commissioning of the equipment.
The input/output cables must be connected in clockwise phase rotation for both Bypass and
Rectifier Input Bars if separate, taking care to avoid risk of short circuit between different poles.
The grounding and neutral connection of the electrical system must be in accordance with local
regulations.
In case of additional cabinets containing batteries, input/ output transformers, etc, their ground
terminals must be connected to the UPS main ground terminal.
Once the power cables have been connected, re-install the internal safety shields and close the
cabinets by re-installing all external panels.
TLE Series 160 - 200 - 225 - 250 Access to the bus bars for the cable connections
A
Utility mains / Battery / Output load
Please remove the plates (B & C)
before drilling any wholes
Fig. 4.8-1 TLE Series 160 - 200 - 225 - 250 Access to connection bus bars
NOTE !
For UPS correct operation, the input utility phase rotation must be clock-
wise.
Modifications reserved
GE_UPS_ISG_TLE_SUL_M16_M50_2bU_V010.docx
Critical Power
C
Utility mains / Battery / Output load
Top entry cables
Q1
Bottom entry cables
B
To access Input, Output
and Battery connections
proceed as follows:
• Remove
the
front
protection panel "A".
• Bottom entry cables:
remove the plate "B".
• Top
entry
cables:
remove the plate "C".
Page 32/60