Installation Requirements - GE FGC TLE Series Manual

40-150 kva/kw, 480 vac three phase highly efficient and scalable
Table of Contents

Advertisement

Critical Power

4.8.4 Installation requirements

Typical examples for the connection of the TLE Series 625 - 750 - 1000.
Single UPS with Common Input Utility for Rectifier & Bypass
Single UPS with Common Input Utility for Rectifier & Bypass, 3-wires distribution (3-phase plus ground)
Single UPS with Dual Input Utility for Rectifier & Bypass
(Connect a single input Neutral to Bypass Utility (inside the UPS, common Neutral for Bypass and
Rectifier)
Single UPS with Dual Input Utility for Rectifier & Bypass, 3-wires distribution (3-phase plus ground)
Modifications reserved