UNPACKING

Move the equipment in it's original packing, carton box or wooden case, until the place of installation
and remove the packing and the transport sockets only just before installing the UPS.
1
2
3
E
D
Fig. 5.6-1 LP 33 Series unpacking sequence
Included in the delivery you can find the following parts:
An accessories bag
Control Bus cables (only for RPA Parallel System)
CD-ROM connectivity
Modifications reserved
OPM_LPS_33E_60K_M12_2GB_V010.doc
B
C
Procedure for the unpacking of the
UPS:
• Make sure to have sufficient
space around the UPS before you
start unpacking.
• Cut the two straps "A" fixing the
carton box.
• Remove package "B".
• Remove the protection "C" outside
the cabinet and the accessories
CENTER
of
GRAVITY
bag Remove the protection "C"
outside the cabinet and the
accessories bag.
• Use a forklift to raise the UPS from
the floor.
• Remove the two wooden plates
"D" by unscrewing bolts "E".