GE FGC TLE Series Manual page 68

40-150 kva/kw, 480 vac three phase highly efficient and scalable
Table of Contents

Advertisement

"Top Cable Entry/Exit Sidecar" (TCE) and "Top Hat Fascia" (THF) assembling
M5x12
C
Edge protection over the metal cut is
mandatory to protect from sharp edges
Fig. 6.1-3 Top Cable Entry/Exit Sidecar (TCE) and Top Hat Fascia (THF) assembling
Remove the roof "A" of the UPS cabinet.
-
Remove side panel "C". This panel is no longer used
-
- Remove, with appropriate tool, the two metallic windows "D" from the metal screen.
- Fix the structure "E" with the appropriate screws.
- Fix the roof "A" of the UPS cabinet.
- Fix the top plate "F" with the appropriate screws.
K nock out appropriate holes in top plate for "Top Cable Entry/Exit Sidecar".
1 2 4 7 B
- Fix side panel "G" with the appropriate screws.
- Fix the structure "Top Hat Fascia - B" with the appropriate screws.
Modifications reserved
GE_UPS_ISG_TLE_SUL_40K_M15_1US_V010.docx
Tensilock
M5x12
Torx
A
Critical Power
Top Hat Fascia
B
Torx
M5x12
D
!
.
Top Cable Entry/Exit Sidecar
F
Torx
M5x12
Torx M5x12
E
Torx M5x12
Installation Guide TLE Scalable Series 40 - 150 UL S1
G
Page 52/53

Advertisement

Table of Contents
loading

Table of Contents