2. Close "Q1 - UPS Output switch" (Pos. I) on all Units.
When closing "Q1 - UPS Output switch" on the last unit of the Parallel System, the Automatic Bypass of all
Units connects to the Load.
Rectifiers start automatically, blinking LED 1 (Rectifier) indicates Soft-start.
At the end of Rectifier Soft-start, the LED 1 (Rectifier) remains lit.
The Synoptic Diagram, on all UPS units, must display the status "LOAD SUPPLIED BY AUTOMATIC BYPASS".
Synoptic Diagram of first unit
NOTE !
Ensure the LED 1 (Rectifier) is lit before carrying out this procedure.
It indicates that the DC-link 1 and DC-link 2 has reached 400Vdc (see screen MEASURES /
Rectifier)!
Attention: check the right DC polarities on both side of the switch/fuse holder!
3. Connect the Battery on all Units by closing the "External Battery Protections" and close, if
present, the "CB3 – External Battery switch" (option).
Synoptic Diagram of first unit
NOTE !
Before performing the next procedure (4) make sure that the LED 3 (Booster/Battery
charger) is lit.
4. Insert the Inverter performing the "Inverter ON" command on first unit.
Perform the "Inverter ON" command from the screen:
Commands 1 / INVERTER / ON.
Soft-start of Inverter, indicated with blinking LED 2 (Inverter).
At the end of Soft-start the LED 2 (Inverter) remains lit.
In case of sufficient output power, the output will transfer to Inverter.
LED ALARM turns Off and the LED LOAD PROTECTED must be lit.
Synoptic Diagram of first unit
Modifications reserved
GE_UPS_USM_TLE_SUL_M16_M50_2bU_V010.docx
Critical Power
Synoptic Diagram of other units
Synoptic Diagram of other units
Synoptic Diagram of other units