Installing The San Volume Controller In The Rack; Closing The Latch-Lock Carrier Assembly - IBM 2145-8F4 Installation Manual

System storage san volume controller
Table of Contents

Advertisement

Installing the SAN Volume Controller in the rack

|
2
1
Figure 47. Closing the latch-lock carrier assembly
1
Latch-lever
2
Latch-lock
9. Push the back rail bracket toward the rear of the rack and align the locating
pins with the rack-mounting flange.
10. Push the latch lock
carrier slides toward the rear of the rack, and the locating pins project through
the holes that are in the rear flange and in the rear rail bracket.
Important: Ensure that the locating pins are fully extended through the rear
rail bracket.
11. On the rear of each rail, press the blue release tab and slide the shipping
bracket off the slide rail. Store the shipping bracket for further use.
You must perform this procedure for both rails.
After installing the support rails, you may install the SAN Volume Controller in
the rack.
CAUTION:
To avoid any hazard from the rack tipping forward when boxes are installed,
observe all safety precautions for the rack into which you are installing the
device.
Perform the following steps to install the SAN Volume Controller in the rack:
1. Stand at the front of the rack and place the back of the SAN Volume Controller
onto the support rails, as low in the rack as possible.
Chapter 4. Installing the UPS, the master console, and the SAN Volume Controller
2
away from the rail to release the carrier. The latch-lock
69

Advertisement

Table of Contents
loading

This manual is also suitable for:

2145-4f22145-8f2

Table of Contents