Attaching The Mounting Bracket To The 2145 - IBM 2145-8F4 Installation Manual

System storage san volume controller
Table of Contents

Advertisement

CAUTION:
To reduce the risk of fire or electric shock, install the 2145 UPS-1U in a
temperature- and humidity-controlled indoor environment, free of conductive
contaminants. Ambient temperature must not exceed 40°C (104°F). Do not
operate near water or excessive humidity (95% maximum). (13)
CAUTION:
To avoid any hazard from the rack tipping forward when devices are installed,
observe all safety precautions for the rack into which you are installing the
device.
After all of the prerequisites have been completed, you can begin the installation
process.
Perform the following steps to install the 2145 UPS-1U in the rack:
1. Open the top of the 2145 UPS-1U shipping carton. Grip the flaps on either
side of the 2145 UPS-1U.
2. Lift the 2145 UPS-1U clear of the shipping carton and place it on a flat, stable
surface.
3. On each side of the 2145 UPS-1U, attach the long end of a mounting bracket
1
to the 2145 UPS-1U using four of the supplied M3 × 6 screws
Figure 29.
Figure 29. Attaching the mounting bracket to the 2145 UPS-1U
1
Mounting bracket
2
M3 × 6 screws
4. Stand at the front of the rack and place the back of the 2145 UPS-1U onto the
support rails, and then slide the 2145 UPS-1U into the rack.
5. At the front of the 2145 UPS-1U, install the two mounting screws
(Figure 30 on page 54).
Chapter 4. Installing the UPS, the master console, and the SAN Volume Controller
1
2
. See
2
1
53

Advertisement

Table of Contents
loading

This manual is also suitable for:

2145-4f22145-8f2

Table of Contents