IBM 2145-8F4 Installation Manual page 85

System storage san volume controller
Table of Contents

Advertisement

7. Remove the protective label from the internal battery connector.
Figure 32. Internal battery connector with protective label
8. Connect the internal battery connector.
Note: A small amount of arcing might occur when connecting the batteries.
This is normal and does not damage the unit or present any safety
concerns.
9. Reinstall the front panel.
10. At the back of the 2145 UPS-1U, plug the 2145 UPS-1U main power connector
into the power socket (
standby mode, so all indicators are off.
Note: The 2145 UPS-1U is intended to maintain power on SAN Volume
Controller nodes until data can be saved to the local hard disk drive.
Only SAN Volume Controller nodes can be plugged into the 2145
UPS-1U or the SAN Volume Controller cluster malfunctions.
Chapter 4. Installing the UPS, the master console, and the SAN Volume Controller
1
in Figure 33 on page 56). The 2145 UPS-1U is in
55

Advertisement

Table of Contents
loading

This manual is also suitable for:

2145-4f22145-8f2

Table of Contents