Before you begin this task, refer to the user's cable connection table in the IBM
System Storage SAN Volume Controller: Planning Guide to identify the 2145 UPS-1U
to which this SAN Volume Controller 2145-8F2 or SAN Volume Controller 2145-8F4
is to be connected.
Perform the following steps to connect the SAN Volume Controller 2145-8F2 or
SAN Volume Controller 2145-8F4 to the 2145 UPS-1U:
1. At the back of the SAN Volume Controller 2145-8F2 or SAN Volume Controller
2145-8F4, plug a power cable into the power connector
4
5
Figure 49. Connecting the SAN Volume Controller 2145-8F2 power cable to the 2145
UPS-1U
1
Fibre-channel ports
2
Power connector
3
Serial connector
4
Ethernet ports
5
Main power connector
6
Communication port
7
Load segment 2 receptacle
2. Place the other end of the power cable into the rightmost load segment 2
7
receptacle
on the 2145 UPS-1U.
3. Plug the signal cable into the serial connector
Controller 2145-8F2 or SAN Volume Controller 2145-8F4.
DANGER
You have already switched on the 2145 UPS-1U. The output sockets of the
2145 UPS-1U are live.
4. Place the other end of the signal cable into the communication port
2145 UPS-1U.
The SAN Volume Controller power is now connected to the 2145 UPS-1U.
Related tasks
Chapter 4. Installing the UPS, the master console, and the SAN Volume Controller
1
3
6
ATTENTION
CONNECT ONLY IBM SAN VOLUME
CONTROLLERS TO THESE OUTLETS.
SEE SAN VOLUME CONTROLLER
INSTALLATION GUIDE.
3
located on the SAN Volume
2
. See Figure 49.
2
7
6
on the
71