11. Repeat all of these steps to install additional 2145 UPSs.

Installing the master console

There are a number of steps you must complete to install the master console with
the SAN Volume Controller.
Attention: Before you begin the installation, review and complete all of the safety
checks detailed in the documentation for the master console, the keyboard, and the
display.
Ensure that the user has all of the information needed prior to installation. Refer to
the IBM System Storage SAN Volume Controller: Planning Guide, which provides the
hardware location chart, the cable connection table, and the configuration data
table for the customer to complete prior to installation.
To install the master console in the rack, follow the instructions provided in your
xSeries
to complete the installation.
Important: Do not follow any software installation procedures in the xSeries
Software for the master console is pre-installed, therefore software installation is
not necessary. After all of the prerequisites are completed, you can begin the
installation process.
Perform the following steps to install the master console:
1. Ensure that no cables are connected to the Ethernet ports.
2. Turn on the master console.
3. Turn on the master console.
4. Attach an RID tag to the master console using machine type 2145 and the serial
automatically adjusts the voltage range setting. Take no action for this alarm
condition unless it persists for more than five minutes after a SAN Volume
Controller 2145-4F2 has been connected to this 2145 UPS and powered on.
Related tasks
"Installing the support rails for the 2145 UPS" on page 56
You must install the support rails in the rack before installing the 2145
uninterruptible power supply (2145 UPS).
Related reference
"Preparing your UPS environment" on page 41
Ensure that your physical site meets the installation requirements for the
uninterruptible power supply (UPS).
®
Installation Guide and the instructions provided with the mounting rails
Installation Guide.
a. Type administrator in the User ID field.
b. Type passw0rd in the password field; this password applies to all required
password fields. The master console continues booting.
Note: This process can take several minutes before all services are started
and operations are completely responsive.
number of the SAN Volume Controller that is being installed with the master
console.
Chapter 4. Installing the UPS, the master console, and the SAN Volume Controller
65

Advertisement

Table of Contents
loading

This manual is also suitable for:

2145-4f22145-8f2

Table of Contents