19. Repeat step 1 on page 76 through step 18 on page 77 for each SAN Volume
When the battery is fully charged, the charge progress bar is replaced by the
Cluster option on the front panel display of the SAN Volume Controller. The
installation is now complete. Refer to the IBM System Storage SAN Volume
Controller: Configuration Guide to assist you with the customer configuration
process.
78
IBM System Storage SAN Volume Controller: Installation Guide
b. Press the select button.
c. Press the left or right button until the required language is displayed.
d. Press the select button.
Controller.