Installing The Mounting Screws For The 2145; Removing The 2145 Ups-1U Front Panel - IBM 2145-8F4 Installation Manual

System storage san volume controller
Table of Contents

Advertisement

Figure 30. Installing the mounting screws for the 2145 UPS-1U
Figure 31. Removing the 2145 UPS-1U front panel
54
IBM System Storage SAN Volume Controller: Installation Guide
1
1
Mounting screws
If possible, the two 2145 UPS-1Us should not be connected to the same power
source.
Attention: Ensure that you comply with the following requirements:
v The voltage supplied to the 2145 UPS-1U must be 200 – 240 V single phase.
v The frequency supplied must be 50 or 60 Hz.
Note: The 2145 UPS-1U has an integrated circuit breaker and does not require
external protection.
6. Remove the 2145 UPS-1U front panel.

Advertisement

Table of Contents
loading

This manual is also suitable for:

2145-4f22145-8f2

Table of Contents