Installing The Front End Of The Rail - IBM 2145-8F4 Installation Manual

System storage san volume controller
Table of Contents

Advertisement

Figure 46. Installing the front end of the rail
68
IBM System Storage SAN Volume Controller: Installation Guide
3
Latch-lever
6. Place the front end of the left rail in the rack cabinet. Align the top of the
1
front bracket
(Figure 46) with the required EIA marking that is on the
rack.
2
1
1
Front bracket
2
Rack-mounting flange
3
Locating pins
7. Align the locating pins
flange.
8. Push the latch lock
the carrier. The latch-lock carrier slides toward the front of the rack and the
locating pins project through the holes that are in the front flange and in the
front rail bracket.
Important: Ensure that the locating pins are fully extended through the front
rail bracket.
3
3
with the holes that are in the rack-mounting
2
(Figure 47 on page 69) away from the rail to release

Advertisement

Table of Contents
loading

This manual is also suitable for:

2145-4f22145-8f2

Table of Contents