Connecting The San Volume Controller 2145-Cg8 To The 2145 Ups-1U; Installing The San Volume Controller 2145-Cg8 Node In The Slide Rails Of The Rack; Raising The San Volume Controller 2145-Cg8 Locking Levers Of The Slide Rails Of The Rack - IBM 2145-CG8 Hardware Installation Manual

Ibm system storage san volume controller
Hide thumbs Also See for 2145-CG8:
Table of Contents

Advertisement

Figure 30. Installing the SAN Volume Controller 2145-CG8 node in the slide rails of the rack
2. Lift the locking levers on the slide rails and push the node 2 all the way into
Figure 31. Raising the SAN Volume Controller 2145-CG8 locking levers of the slide rails of
the rack

Connecting the SAN Volume Controller 2145-CG8 to the 2145 UPS-1U

Connect the SAN Volume Controller to the 2145 UPS-1U to protect your data in
the event of an unexpected loss of external power.
Before you begin
Notes:
v To make the SAN Volume Controller clustered system more resilient to power
d. Lower the front of the node 4 until the other nail heads slip into the other
slots on the slide rails.
e. Verify that the front latch 5 slides over the nail heads.
the rack until it clicks into place.
See 1 in Figure 31.
failure, the 2145 UPS-1U units can be connected to the redundant ac-power
switch. If a redundant ac-power switch is not used, you can connect the two
Chapter 2. Installing the SAN Volume Controller 2145-CG8 hardware
35