Juniper MX2010 3D Quick Start Manual page 53

Universal edge router
Table of Contents

Advertisement

Copyright © 2014, Juniper Networks, Inc.
Figure 36: Connecting Power to a Three-Phase Wye AC Power Distribution
Module
CAUTION:
Wire label configuration is for Juniper Networks supplied cable
only. If using your own cable, make sure you use the proper connections.
To connect wires to the terminal block that serves three PSMs:
a. Insert the grounding wire into the grounding point labeled
b. Insert the wire labeled
c. Insert the wire labeled
d. Insert the wire labeled
e. Insert the wire labeled
WARNING:
In order to protect power supplies from input voltage that may
be caused by mis-wired PDMs, before reinstalling the metal cover to the
wiring compartment apply AC voltage to the PDM (with disengaged PSM)
to make sure that two LEDs on the PDM are lit green and that the AC
voltage between AC terminal blocks A1-N1, B1-N1, C1-N1, A2-N2, B2-N2,
and C2-N2 for three-phase wye PDM is not more than 264VAC when
measured with a DVM. Then turn off the AC breaker de-energizing the
PDM and install the metal cover and engage all AC PSMs.
Connect Power to a Three-Phase Wye AC Power Distribution Module
into the input terminal labeled
L1
L2
into the input terminal labeled
into the input terminal labeled
L3
N
into the input terminal labeled
.
GND
.
A2
B2
.
.
C2
N2
.
53

Advertisement

Table of Contents
loading

Table of Contents