Required equipment
Mechanical lift
Storage enclosure with attached inner rails
Rack cabinet with installed outer rails
#2 Phillips-head screwdriver, 6-in length
Panhead screw, M5 x 8, #2
Phillips-head screw, M5 x 15, 8mm hex flange
To mount the 2U enclosure into the rack cabinet:
1. Confirm that the outer rails are properly and securely installed in the rack cabinet.
2. Complete the following actions to position the mechanical lift and the 2U chassis:
a. Using proper safety precautions, position the 2U chassis on the mechanical lift perpendicular to the lift wheels.
b. Move the mechanical lift into position perpendicular to the rack cabinet so that the 2U chassis is parallel to the opening
and is a minimum of 5 to 7 inches (12.7cm to 17.78cm) away from the rack cabinet.
c. Adjust the mechanical lift height to be as close as possible to the allocated 2U location.
d. Moving only the 2U chassis, position it so the attached inner rails align with the outer rails in the rack.

Figure 12 Alignment between 2U chassis and rails (removed rear components for clarity)

3. Complete the following actions to properly secure the 2U chassis on the outer rails:
a. Keep the 2U chassis stationary on the lift.
b. Verify that both outer rails fully engage the 2U chassis inner rails.
c. Guide the chassis inward with the leading edge of each inner rail inside the top and bottom lip of the outer rail.
d. Conduct a visual inspection of both sides to verify both inner rails are an equal distance along the outer rail and that
the direction is straight in, not at an angle.
Qty
Identification
1
N/A
1
N/A
1
N/A
1
N/A
2
2