Upgrading A Simm Module - Sun Microsystems Sun StorEdge A3500 Manual

Hide thumbs Also See for Sun StorEdge A3500:
Table of Contents

Advertisement

8. Replace the front panel.
See Section 5.1.2 "Replacing the Front Panel" on page 5-3.
9. Use the RAID Manager software to check the status of both controllers and
perform any additional recovery procedures.
Refer to the Sun StorEdge RAID Manager 6.22 User's Guide for instructions.
10. Check the controller module status to make sure it is operating without error.
Note – This is a good time to do a complete backup of the disk array.
6.3.2

Upgrading a SIMM Module

Use this procedure to upgrade controller module memory.
Note – This procedure is applicable only to SCSI controller modules.
FIGURE 6-3
Caution – Electrostatic charges can damage sensitive components. Use a grounding
!
wrist strap or other antistatic precautions before removing or handling the
controllers.
1. Attach an antistatic wrist strap to yourself and to the cabinet.
2. Remove the controller canister for the SIMM.
See Section 6.3.1 "Removing and Replacing a Controller" on page 6-5.
3. Unpack the new SIMM module.
4. Remove the six screws from the top of the controller canister (
Lift the top plate from the canister and set it aside.
shows processor SIMMs and data cache SIMM locations.
FIGURE 6-3
Chapter 6
Servicing Other Components
).
6-7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sun storedge a3500fcStoredge a3000

Table of Contents