Lubrication; Main Gear Removal; Main Gear Installation; 100-Hour Inspection - Raytheon BEECH BARON 58P Maintenance Manual

Table of Contents

Advertisement

BEECHCRAR
BARON 589 AND BARON 58TC
MAINTENANCE MANUAL
d.
Unsnap
the
canvas cover
and disconnect the
MAIN GEAR AND DOORS
MAINTENANCE
uplock
and downlock assemblies from the strut.
PRACTICES
e.
Open
the brake
cylinder
bleed
ports
and
pump all
fluid from the
system.
MAIN GEAR SHOCKABSORBERS
f.
Disconnect the
hydraulic
line where the flexible
hose
couples
to
the
tubing
on
the
landing
gear.
To check the fluid level in the
landing
gear
shock
absorbers,
g.
Disconnect
the
safety
switch wire.
deflate the
strut
by
releasing
the air
through
the valve and
h.
Remove
the bolt
attaching
the lift
leg
to
the
strut.
permit
the
strut to
fully
compress, then
remove
the filler valve.
i.
Remove
the
access
door in the lower surface of
the
wing leading edge
for
access
to
the forward
hinge
bolt
retaining
nut and
remove
the
nut.
The
rear
strut
brace
hinge
WARNING
bolt is accessible
by lowering
the
flap.
j.
Remove
cotter
pins
and
nuts
(8),
washers
(5),
bolts
Do
not
remove
the filler valve until all air
(2
and
3),
washers
(4
and
7),
and
bushings (6)
from the front
pressure has been released
or
it may be blown
and
rear
spars
(10
and
11).
off with considerable
force,
causing injury
to
k.
Lower
the main gear
assembly
away from
the
personnel
and
property damage,
aircraft,
being
careful
not to
bend the skin
at
the wheel well
edge.
I
If the fluid level is
low,
add Mll-H-5606
or
Mll-H-83282
MAIN GEAR INSTALLATION
hydraulic
fluid
(13,
Chart
207,
91-00-00)
until the fluid
(Figure 201)
overflows
slightly. Slowly cycle (compress
and
extend)
the
strut to
expel
any
trapped
air. Add
fluid,
as
necessary, and
a.
Carefully
position
the main gear
assembly
in
place
install the filler valve.
against
the front and
rear
spars
(10
and
11).
b.
Align
bolt holes and install
bushing (6),
bolts
(2
and
With the aircraft
resting
on
the
ground
and the fuel cells
full,
3),
washers
(4,
5,
and
7),
and nuts
(8). Torque
to
250
to
400
inflate the main
strut
until 3 inches of the
piston
is
exposed.
inch-pounds.
Install
new
cotter
pins.
Rock the aircraft
gently
to
prevent possible binding
of the
piston
in
the barrel when
inflating.
NOTE
CAUTION
Use
one
100951S016XF washer
between
main gear and spar
having
a
maximum total gap
Do
not
inflate the
struts while the
aircraft
is
on
of .016
to
.031 inch. Use
one
100951X032XF
jacks,
since sudden extension
or
over-inflation of
washer if gap is .032
to
.047 inch.
the struts
may bend the
torque
knee.
c.
Install the
access
door in the lower
wing leading
LUBRICATION
edge.
d.
Install the bolt
attaching
the lift
leg
to
the
strut.
Lubricate the main wheel
bearings
and grease
fittings
as
e.
Connect
landing
gear
safety
switch wire.
detailed
in
the Lubrication
Chart,
Chapter
12-20-00.
f.
Connect the brake
hydraulic
line.
g.
Connect
the
uplock
and downlock assemblies
to
the strut and snap the
canvas cover
in
place.
MAIN GEAR REMOVAL
h.
Connect the
inboard
landing
gear door
actuating
(Figure 201)
rod
to
the forward
door
hinge.
i.
Install the outboard
landing
gear door
to
the
When
removing
the
landing
gear,
take
care
to
preserve the
landing
gear
strut.
original adjustments
at
the rod
end
fittings
to
facilitate
j.
Bleed
the brake.
reassembly,
k.
Operate
the
landing
gear and check
for proper
rigging
of the
uplock
and doors.
a.
With the aircraft
on a
jack,
retract
the gear until the
inboard
landing
gear door is in the
fully
open
position.
100-HOUR INSPECTION
b.
Remove the outboard
landing
gear door from the
landing
gear
strut.
ACTUATOR
AND MOTOR
Check
the actuator and
c.
Disconnect the inboard
landing
gear door
motor
for
security,
visible
damage
and condition.
Check
actuating
rod at the forward door
hinge.
motor
wiring
for breaks and chafed
or
deteriorated
32-10-00
Page
201
Nov 30/78

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Beech baron 58paBeech baron 58tcBeech baron 58ca

Table of Contents