Overhaul And Replacement Schedule - Raytheon BEECH BARON 58P Maintenance Manual

Table of Contents

Advertisement

Raytheon
Aircraft
BEECH BARON 58P AND BARON 58TC MAINTENANCE MANUAL
OVERHA UL AND REPLACEMENT SCHEDULE
NOTE
All items
not
listed
are
to
be overhauled
or
replaced
"On Condition". "On Condition" items
are
to
be
overhauled
or
replaced
if
inspection
reveals
a
potentially
unsafe
or
unserviceable
condition,
if
they
are
worn,
inoperative,
inaccurate,
intermittent and
not
repairable through
normal maintenance. Pri-
marily
items that
are
calender,
cycle
or
hour limited
are
included in the
following
list.
CHART1
OVERHAUL AND REPLACEMENT SCHEDULE
ITEM
OVERHAUL OR REPLACE
LANDING GEAR
Main Gear
On Condition
(Leaking
or
collapsed
struts
that
cannot
be
corrected
by
seal
replacement
will constitute the "On
Condition"
requirement. Any pitting,
corrosion,
cracking,
distortion
or
visible
wear
noted
during
the
replacement
will also constitute the
requirement
for
an
overhaul.)
Nose Gear
On Condition
(Leaking orcollapsed
struts
that
cannot be
corrected
by
seal
replacement
will constitute the "On
Condition"
requirement. Any pitting,
corrosion,
cracking,
distortion
or
visible
wear
noted
during
the
replacement
will also constitute the
requirement
for
an
overhaul.)
Actuator
Assembly
Gray
and green colored
actuators
every
2,000
hours.
White colored
actuators
every
4,000
hours.
Retract Motor
Every
2,000
hours
Retract Motor Brushes
Every
500 hours
or
On Condition
Shimmy Damper
On Condition
Wheels and Tires
On Condition
Brake
Assembly
On
Condition
Brake
Lining
On Condition
Master
Cylinder
On Condition
Shuttle Valve
Assembly
On Condition
Parking
Brake Valve
On Condition
All Hoses
On Condition
Jun
2 8 / 0 2 P a g e
202
5-1 0-00
n25

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Beech baron 58paBeech baron 58tcBeech baron 58ca

Table of Contents