Adjustment; And After); (Tj-3 And After); Regulator - Raytheon BEECH BARON 58P Maintenance Manual

Table of Contents

Advertisement

BEECHCRAFT
BARON 58P AND BARON 58TC
MAINTENANCE MANUAL
I
ADJUSTMENT
(TJ-3
and
after)
emergency
door deflate valve and install the tube
assembly
DOOR SEAL AUTOMATIC DEFLATE SWITCH
c.
Remove caps from the tube
assembly
and
on
the emergency door deflate valve.
a.
Gain
access
to
the
automatic
deflate switch
by
d.
Install the
upholstery panel
on
the forward cabin
removing
the
upholstery panels
at
the aft
edge
of the door
door.
frame.
b.
Close and lock the forward cabin door.
STANDBY DOOR SEAL PRESSURE REGULATOR
c.
Back the switch
actuator
off until the switch is
not
REMOVAL
(TJ-3
and
after)
actuated.
d.
Readjust
the
switch until it
actuates.
a.
The door seal pressure
regulator
is accessible
e.
Adjust
switch overtravel
to
.03 inch at the
tip
of the
from within the
fuselage,
aft of the pressure bulkhead
(FS
actuator.
39.00),
on
the
right
hand side of the
pilot's
compartment.
f.
Install the cabin
upholstery panels,
b.
Disconnect the electrical connections. Remove
the
valve inlet and outlet hoses from the valve.
c.
Remove the washers and screws, which hold the
EMERGENCY DOOR
DEFLATE VALVE REMOVAL
valve
secure,
and
remove
the valve.
(TJ-3
and
after)
STANDBY DOOR SEAL PRESSURE REGULATOR
a.
Remove the
upholstery panel
from the forward
INSTALLATION
(TJ-3
and
after)
cabin door
to
gain
access
to the
emergency door deflate
valve.
a.
Position the door seal pressure
regulator
valve and
b.
E;lsure that the door seal
pressurization
system
is
secure
with the washers and
screws.
OFF and that the door seal is deflated.
b.
Install the inlet and outlet hoses
on
the valve and
c.
Disconnect the tube
assembly
from the emergency
secure
the hoses with the
clamps.
door deflate valve.
Cap
the tube and valve
openings,
to
c.
Connect electrical wires
to
the
regulator.
prevent
contaminants from
entering
the
system.
d.
Conduct the PRESSURIZATION TEST
d.
Remove the
attaching
screws
which hold the
PROCEDURE
as
described
in
Chapter
21-30-00.
emergency
door deflate valve in
place
and
remove
the valve.
FORWARD CABIN DOOR SEAL LEAK TEST
(TJ-3
and
after)
EMERGENCY DOOR DEFLATE
VALVE
INSTALLATION
(TJ-3
and
after)
a.
Remove the door seal
supply
tube
at
the door
seal
regulator
or
at
the door seal pressure tank.
a.
Place
the
em~rgency
door deflate valve
in
position
b.
Attach
an
air
supply
source
to
the door seal
and
install
attaching
screws.
To facilitate
adjustment,
do
not
supply
tube and
pressurize
the door seal
system
to 13
psig
tighten
screws.
and allow
to
stabilize for 15
to
20 minutes
prior
to
beginning
b.
Adjust
the emergency door deflate valve
as
check.
follows,
c.
Isolate the door seal
system
from the air
supply
(volume
of
supply
line shall not exceed
ten
cubic
inches).
1.
Place the door handle
in
the EMERGENCY
d.
Pressure
remaining
in
the
system
shall
not
be
DOOR SEAL DEFLATE
position,
less than 12
psig
after one-half hour for door seal
2.
Slide the emergency door deflate valve afr
installation
only (TJ-3
thru
TJ-168)
or
11.5
psig
after
one-
until the
cam
follower of the valve makes
contact
with the
half
hour for door seal and emergency deflate valve
cam
plate
of the hook
assembly.
Continue
moving
the valve
plumbing
installation
(TJ-169
and
after).
ah until the
cam
follower is
fully
closed
against
the valve
e.
If the leak rate
exceeds the allowable
in
step "d",
stem,
isolate the leak
using
an
appropriate
leak
test
solution
to
3.
Tighten
the
emergency door valve
attaching
determine
if the leak exists in either the door seal
supply
screws
to
hold the valve in the
position
as
described
in
step
tube,
the door tube
or
the door seal. Remove and
replace
"2".
as
required.
"END"
21-31-00
p~
M3
Mar 21/80

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Beech baron 58paBeech baron 58tcBeech baron 58ca

Table of Contents