And After) - Raytheon BEECH BARON 58P Maintenance Manual

Table of Contents

Advertisement

BEECHCRAFT
BARON 58P AND BARON 58TC
MAINTENANCE MANUAL
TJ-168, except
TJ-153 and 3.9
psi
on
TJ-153 and TJ-169
CTJ-3
AND
AFTER)
in
Chapter
52-10-00. If
leakage
still
and after
as
observed
on
the CABIN PRESSURE indicator.
exists
around
the
door,
replace
the ah cabin door seal
as
described
in AFT
CABIN DOOR SEAL REPLACEMENT
(TJ-3
AND
AFTER)
in
Chapter
52-10-00. Perfomn leak
test
NOTE
as
described
in
steps
"a"
through
"h".
5.
Check around
the windows for
leaks,
remove
Ensure that the back pressure air is maintained
and
replace
windows found
to be
defective.
at
.7
psi
above the cabin differential pressure
on
the CABIN
PRESSURE
indicator
on
the
test
unit.
NOTE
h.
Pressurize the
cabin
to
a
differential pressure of
Ensure that the
test
unit is
working properly
and
3.00
-c
.50. Allow five minutes for the cabin
pressure
to
all
gages
are
accurate.
stabilize. After stabilization is
established,
check the cabin
for excessive
leakage.
A 38 cubic feet per minute
leakage
is
permissible.
If the
leakage
is indicated
at
more
than 38
6.
Gain
access
to the
points
where the control
cubic feet per minute isolate the
cause
and
repair
as
cables,
electrical wire
bundles,
plumbing,
and
landing
gear
described
in
the
following paragraphs,
retract rods enter the
pressure vessel
by removing
the
seats,
floorboards,
and
upholstery.
Fill the control cable
1.
Check all connections
to
the pressure
pressure
seals
with Mil-6-23827
grease
(11,
Chart
207,
91-
vessel,
test
unit,
and the '7" and/or "Y"
fittings
in
the
test
00-00)
and
paint
the control
cables,
through-out
its full travel
hoses
to
ensure
that
no
leaks exist.
Repair
all leaks and
through
the pressure seals with MlL-G-23827 grease
(11,
repeat steps
"f."
through
"h".
Chart
207,
91-00-00). Spread
the electrical wire bundles
2.
If leaks
are
suspect
through
the
outflow
or
apart
and
apply
EC1239A1/2 sealant around each wire. After
safety
vales,
depressurize
the pressure vessel
at
a
rate
of
each wire is
vinyl
around the wire
1,000
feet per
minute,
disconnect the back
pressure hose
at
bundle
(butted
against
seal
fitting)
and
inject
EC1239AVz
the
safety
valve and install
a
Leak Test
Valve
(P/N
102-
sealant in the notch of the seal
fitting. Apply
EC1239B1/2
590020/939
or
equivalent)
on
the
atmosphere
ports
of the
sealant
to
all
plumbing fittings
at
Be pressure vessel.
safety
and outflow valves. Pressurize the pressure vessel
Ensure that
the
landing
gear
retract rods
pressure boots
are
per
steps
"f"
through
"h",
allow the pressure
to
stabilize.
properly
installed without
damage.
Perform the
Leakage through
each valve shall
not
exceed .23
pound
per
pressurization
leak
test
as
described in "a"
through
"h".
minute
(192
cubic feet per
hour).
Slight
adjustment
of the
7.
Remove
all seats,
floorboards,
and
outflow and
safety
valve
mounting
screws
may reduce
the
upholstery panels.
Check the
complete
pressure vessel for
leakage
rate
considerably.
If the outflow and/or
safety
leaks. Isolate
and
repair
all leaks.
Repeat
steps
"a"
through
valves
are
determined
to
be
defective,
replace
as
"h".
necessary. Perform
the leak
test
described
in
steps
"f'
through
"h".
i.
With the pressure leak
test
within
tolerance,
3.
Check the seal around the forward cabin
depressurize
the
pressure vessel and
remove
the
safety
door. If excessive
leakage
is detected around the forward
net.
cabin door, check
to
ensure
that the door seal is inflated
j.
Remove all
test
hoses from the
airplane
and
and the door is closed
securely.
If
leakage
continues,
connect the
hoses between the
fuselage
and the
engines.
perform
FORWARD CABIN DOOR LEAK TEST
as
k.
Install the control
port
tubing
on
each outflow and
described
in
Chapter
21-31-00.
Repair
any leaks found
in
safety
valve.
the door seal and
perform
steps
"a"
through
"h". If
leakage
i.
Connect the forward cabin door pressure tube
to
is still indicated around the forward cabin
door,
rig
the door
the forward cabin door pressure
system.
in accordance with
FORWARD CABIN DOOR RIGGING
m.
Ensure that the back pressure
test
hose is
(TJ-3
AND
AFTER)
in
Chapter
52-10-00. Perform leak
test
removed from
the
atmosphere
vent
fitting
of the
safety
valve
as
described in
steps
"a"
through
''h".
(located
on
the aft side of the ah
bulkhead).
4.
Check the ah cabin door for
leakage,
if
n.
Install
floortoards, upholstery panels,
seats, and
leakage
is
indicated,
adjust
the aft cabin door latch
as
access
panels
which
were
removed
during
the
test
described
in AFT
CABIN DOOR LATCH ADJUSTMENT
procedure.
21~0-00
Page
204
Mar21/80

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Beech baron 58paBeech baron 58tcBeech baron 58ca

Table of Contents