Preparations Before Installation; Inspection Of Packing - AGFA ADC Compact Plus Manual

Hide thumbs Also See for ADC Compact Plus:
Table of Contents

Advertisement

DD+DIS064.02E
2
2.1
Edition 1, Revision 4
Controls, Connections and Setup Procedures

Preparations before Installation

Inspection of Packing

The following actions should be taken upon delivery of the system
components, preferably by the customer:
· Completeness check of the shipment by means of the bill of material
(number of pallets).
· Comparison of the labels on the boxes with the customer's order list and
the shipping papers.
· Checking of the packing material for visible transport damage such as
- dented edges
- damage on the box
- torn fixing elements (metal straps, screws).
In case of damage visible from the outside turn to your local AGFA
representative.
· Checking of the attached safety indicators on the packing boxes.
If the machine was tilted, the
arrow head in the circle of the
TILTWATCH changes from
white to red.
ADC Compact Plus
If the machine was subjected to
shocks, the square field in the middle
of the SHOCKWATCH changes from
white to red.
(Type 5146)
Chapter 1 / 5

Advertisement

Table of Contents
loading

This manual is also suitable for:

5146

Table of Contents