Installing the cable harness
Routing the cable harness
•
Insert the cable harness as shown in (1) Fig. 1 in the back of the stand.
Fig. 1
•
Route the cable (1/Fig. 1) to the generator and connect it as described in the installation
instructions.
•
Route the cable (2/Fig. 2) in the lower part of the stand and secure it with cable ties.
Fig. 2
Siemens AG
Medical Engineering
2
Register 5
RXB7-230.091.05
Rev. 03
1
Page 1 of 14
07. 98
TD SD 24
4 - 1
4
4
MAMMOMAT 300 / 3000