7
Installing the Handle Assembly
Parts needed for this procedure:
1
Handle assembly
1
Pin
2
Roll pin
Procedure
1. Position the handle assembly onto the handle mount
assembly
(Figure
10).
2. Secure the handle assembly with a pin and a roll pin
(Figure
10).
Figure 10
1. Handle assembly
2. Roll pin
3. Pin
4. Handle mount assembly
8
Installing the Bagger
Assembly
Parts needed for this procedure:
1
Bagger assembly
2
Pin and hairpin cotter pin assembly
2
Nut (3/8 inch)
1
Threaded rod
2
Yoke
2
Clevis pin spring
Procedure
Note: After installing the bagger, open the bagger door and
remove the discharge tubes.
1. Position the bagger on its back
2. Slide the hooks onto the lower mounting bracket
(Figure
11).
3. Rotate the bagger up on the lower bagger mounting
bracket.
4. Align the hole in the bagger with the upper mounting
bracket
(Figure
5. Install the pin and secure it with the hairpin cotter pin
on both sides
(Figure
10
(Figure
11).
11).
11).