Reactor; Checking Procedures - Daikin Sensira Series Service Manual

Split r32
Table of Contents

Advertisement

To re-install the front grille

2.11 Reactor

2.11.1 Checking procedures

To perform an electrical check of the reactor
FTXF20~71A + FTXF20~25B + FTXF20~42C + ATXF20~71A + ATXF20~42C
+ RXF20~71A + RXF20~60B + RXF20~42C + ARXF20~71A + ARXF20~42C
Split Sensira R32
ESIE18-12E – 2021.02
e Switch box
2 Route the connectors of the indoor unit fan motor, swing flap motor and
swing raster motor (if equipped) inside the switch box and connect them to
the indoor unit PCB.
3 Install and tighten the screw to secure the switch box.
4 Install the heat exchanger thermistor in its holder.
5 Connect the grounding wires to the heat exchanger using the screws.
6 Connect the power supply wiring to the power supply terminal X1M.
1 Install the front grille and firmly engage the 3 upper hooks.
2 Install 2 screws (class 20~42) or 3 screws (class 50~71) back on the front grille.
3 Install the air filter and then mount the front panel.
Prerequisite: Stop the unit operation via the user interface.
Prerequisite: Turn OFF the respective circuit breaker.
1 Remove the required plate work, see
DANGER: RISK OF ELECTROCUTION
Wait for at least 10 minutes after the circuit breaker has been turned OFF, to be sure
the rectifier voltage is below 10 V DC before proceeding.
2 Visually check the reactor for any damage or burnt‑out components. If any
damage is found, replace the reactor, see
Class 20~42 units
1 Check the connections of the reactor on the main PCB and check continuity of
the wires, see
"5.2 Wiring
2 Remove the Faston connectors from the reactor.
a Reactor
3 Using a megger device of 500 V DC, check the insulation resistance. Make sure
there is no earth leakage.
"2.10 Plate
"2.11.2 Repair
4
diagram" [
 142].
a
2
Components
|
4
work" [
 101].
4
procedures" [
 114].
Service manual
111

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents