4.4.
Integration constraints
Location of a water treatment system is important. The following conditions are required:
CAUTION
The surface for installation (platform or floor) must be solid, flat and level.
MANDATORY
Drain must be capable of handing a maximum backwash flow rate of 19 L/min.
•
locate the softener as close as possible from drain discharge point and within 12.2 m maximum
of drain discharge point, respecting minimum drain line diameter advises given at chapter
4.6.1. Drain line connection, page 39;
•
room to access equipment for maintenance and adding salt in the brine tank;
•
constant electrical supply to operate the controller;
•
total minimum pipe run to water heater of 3 m (10 ft) to prevent backup of hot water into system;
•
always install check valve to protect the softener from hot water return;
•
water line connections with shut off or bypass valves;
•
must meet any local and state codes for site of installation;
•
use flexible piping to connect main piping to softener;
•
be sure all soldered pipes are fully cooled before attaching plastic valve to the plumbing.
Ref. MKT-IM-045 / A - 13.03.2020
Installer Manual Riversoft - Installation
27 / 90