Regeneration Test; Recommended Maintenance Plan - Pentair Riversoft Installer Manual

Hide thumbs Also See for Riversoft:
Table of Contents

Advertisement

Installer Manual Riversoft - Maintenance

8.1.3. Regeneration test

1. Check condition of brine tank and any associated equipment.
2. Check salt level in brine tank.
3. Initiate regeneration test.
→ Check brine draw during brine draw stage and make sure of proper function.
→ Check brine tank refill and make sure of proper function.
→ Check operation of safety brine valve, where fitted ***.
→ Check for brine draw off levels.
→ Check for resin loss at the drain during regeneration.
→ Where fitted, check for satisfactory operation of solenoid, i.e. outlet shut off during
regeneration and/or brine line shut off valve(s).
4. Test and record Total Hardness of outlet water from softener.
8.2.

Recommended maintenance plan

Items
1 year
Injector &
filter
Refill
controller &
ball **
DLFC & ball **
Aircheck &
balls ***
Bypass
Flappers **
Flappers
spring
Check for
watertightness
O-rings**
/clean or
replace in case
of leakage
Motor, motor
cable and
Check
optical sensor
harness
58 / 90
2 year
Clean
Clean
Clean
Clean
Clean
Clean
-
-
-
-
-
-
-
-
Check for
watertightness
/clean or
replace in case
of leakage
Check
3 year
4 year
Clean
Clean
Clean
-
-
-
-
Check for
Check for
watertightness
watertightness
/clean or
/clean or
replace in case
replace in case
of leakage
of leakage
Check
Check
Ref. MKT-IM-045 / A - 13.03.2020
5 year
Clean/ replace
Clean
if necessary
Clean/ replace
Clean
if necessary
Clean/ replace
Clean
if necessary
Clean/ replace
-
if necessary
Clean/ replace
-
if necessary
-
Replace
-
Replace
Check for
watertightness
/clean or
replace in case
of leakage
Replace

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Riversoft 4Riversoft 8Riversoft 15Riversoft 30

Table of Contents