Omron LD-105CT User Manual page 186

Ld cart transporter
Hide thumbs Also See for LD-105CT:
Table of Contents

Advertisement

10.9  Replacing Non-Periodic Parts
Some customers have expressed a desire to perform the commissioning procedures on a
l
regular basis as part of their preventive maintenance process.
NOTE: After performing either of these tests, you can access the other test by
clicking Next Test on the final screen.
E-Stop Commissioning
This procedure verifies that the E-Stop circuitry is triggered when the E-Stop button is pressed.
This is verified by ensuring that you hear the brakes activate after pressing the E-Stop button.
1. Ensure that the E-Stop button is NOT depressed before starting.
2. From the MobilePlanner software, select:
Main Menu > Robot > Safety Commissioning
3. Follow the on-screen instructions to complete the test. You can print a certificate after
successful completion of the commissioning.
Safety Laser Commissioning
This procedure verifies that the safety scanning laser reports speed zone information correctly,
and that the E-Stop circuitry is tripped when an obstacle that should be detected by the laser is
placed in front of the AMR. The speed zones are listed in the following table. (When you press
the Drive button in the wizard, the wizard will display the maximum AMR speed.)
1. From the MobilePlanner software, select:
Main Menu > Robot > Safety Commissioning
2. Follow the on-screen instructions to complete the test. You can print a certificate after
successful completion of the commissioning.
186
Maximum Speed (mm/s)
Zone
LD-105CT
0
225
1
450
2
675
3
900
4
1125
5
1350
6
1350
7
1350
LD Cart Transporter User's Manual
LD-130CT
150
300
450
600
750
900
900
900
14766-000 Rev H

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ld-130ctLd-60Ld-90

Table of Contents