Install The Light Tower - Graco HydroShield Instructions Manual

Air-assisted batch waterborne isolation systems
Table of Contents

Advertisement

4. Remove the feet (3a, 3b, 3c) from the frame.
Figure 5 Removing the Frame Feet
5. Secure the system to the wall.
Mount on
on the
the Floor
Floor
Mount
Mount
on
the
Floor
1. Use the bolt pattern to drill holes into the floor.
Figure 6 Bolt Pattern for Floor Mounting
2. With two people, remove the isolation system
from the shipping pallet.
3. Secure the system to the floor.
3A7370C
Install the
the Light
Light Tower
Tower
Install
Install
the
Light
Tower
The system is equipped with a light tower which
indicates how much paint is in the isolation fluid
pump (K) as it fills and dispenses.
1. Locate the light tower bracket (61) on the
isolation cabinet (CA). Use screws (66), washers
(67), and nuts (68) to mount the light tower (LT)
onto the light tower bracket (61).
The light tower bracket can be removed from the
isolation cabinet and installed in another location.
If relocated, make sure that the light tower is
installed in a non-hazardous location and that the
painter can see it from the spray booth.
Longer extension cables are available. See
Accessories, page
2. Connect the CAN extension (.4m) cable (121226)
to the CAN cable on the light tower (LT).
3. Connect cable to the control interface (C) so that
the isolation system can communicate with the
light. Longer cables are available.
4. The bottom of the controller contains two fittings.
Screw the end of the CAN cable into the fitting
(111). See
Connect the CAN Cables, page
Installation
132.
21.
15

Advertisement

Table of Contents
loading

Table of Contents