Install The Light Tower - Graco HydroShield WMBH00 Instructions - Parts Manual

Air-assisted batch waterborne isolation systems
Table of Contents

Advertisement

4. Remove the feet (3a, 3b, 3c) from the frame.
Figure 5 Removing the Frame Feet
5. Secure the system to the wall.
Mount on
on the
the Floor
Floor
Mount
Mount
on
the
Floor
1. Use the bolt pattern to drill holes into the floor.
Figure 6 Bolt Pattern for Floor Mounting
2. With two people, remove the isolation system
from the shipping pallet.
3. Secure the system to the floor.
3A7370B
Install the
the Light
Light Tower
Tower
Install
Install
the
Light
Tower
The system is equipped with a light tower which
indicates how much paint is in the pump as it fills and
dispenses.
1. Locate the light tower bracket (61) on the
isolation cabinet (CA). Use screws (66), washers
(67), and nuts (68) to mount the light tower (LT)
onto the light tower bracket (61).
The light tower bracket can be removed from the
isolation cabinet and installed in another location.
If relocated, make sure that the light tower is
installed in a non-hazardous location and that the
painter can see it from the spray booth.
Longer extension cables are available. See
Accessories, page
2. Connect the CAN cable on the light tower (LT)
to the control interface (C) so that the isolation
system can communicate with the light. A 1
meter (3.28 ft) cable is provided. Longer cables
are available.
3. The bottom of the controller contains two fittings.
Screw the end of the CAN cable into the fitting
(111). See
Connect the CAN Cables, page
Table 4 4 4 Meaning
Meaning of of of Light
Light Tower
Table
Table
Meaning
Light
Light
Definition
Light
Light
Definition
Definition
Green (solid)
The pump is 50% full or more.
Yellow (solid)
The pump is less than 50% full
but more than 10% full.
Red (solid)
The pump is less than 10% full.
Installation
92.
Tower Colors
Colors
Tower
Colors
21.
15