Lp Conversion Instructions - Lopi Pro Builder 72 Linear GSB2 Installation Manual

Table of Contents

Advertisement

LP Conversion Instructions

WARNING
This conversion kit shall be installed by a qualified service agency in accordance with the manufacturer's
instructions and all applicable codes and requirements of the authority having jurisdiction. If the
information in these instructions is not followed exactly, a fire, explosion or production of carbon
monoxide may result causing property damage, personal injury or loss of life. The qualified service
agency is responsible for the proper installation of this kit. The installation is not proper and complete until
the operation of the converted appliance is checked as specified in the manufacturer's instructions
supplied with the kit.
The parts required to convert this appliance to us LP gas are included in the stove pack that was
shipped with the appliance. The conversion kit contains the LP manual regulator and Torx
wrench, burner orifice, and pilot orifice.
1. Access the firebox.
2. Remove the media tray. Remove the 17 screws holding it in place (1/4" nutdriver). (Due to the length
of the unit we are only showing one half of the media tray).
© Travis Industries
Installation
(for qualified installers only)
11/9/20 - 1478
49
PB 72 GSB2/GSR2 Aust.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pro builder 72 linear gsr2

Table of Contents