Lopi Pro Builder 72 Linear GSB2 Installation Manual page 52

Table of Contents

Advertisement

52
7. Install the LP pilot orifice following the instructions below.
(a) Use a 7/16" open-end wrench to remove the pilot hood.
(b) Remove and discard the Natural Gas (NG) orifice. Place the LP orifice in the pilot assembly then replace
the pilot hood, tightening the pilot hood until it is snug (do not over-tighten).
a
© Travis Industries
Installation
(for qualified installers only)
Natural Gas Orifice = .018N
LP (Propane) Orifce = .014LP
7/16" Wrench
.018N
.014LP
11/9/20 - 1478
b
PB 72 GSB2/GSR2 Aust.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pro builder 72 linear gsr2

Table of Contents