Table 13: Site Preparation Checklist (continued)
Item or Task
Acquire cables and connectors:
Determine the number of cables needed
based on your planned configuration.
Review the maximum distance allowed for
each cable. Choose the length of cable based
on the distance between the hardware
components being connected.
Plan the cable routing and management.
RELATED DOCUMENTATION
General Electrical Safety Guidelines and Warnings | 152
Overview of Installing the Optical ILA | 53
Unpacking and Mounting the Optical ILA | 54

Optical ILA Site Guidelines and Requirements

IN THIS SECTION
Optical ILA Environmental Requirements and Specifications | 44
Optical ILA Clearance Requirements for Airflow and Hardware Maintenance | 45
Optical ILA Physical Specifications | 46
Optical ILA Rack Requirements | 46
Optical ILA Cabinet Requirements | 47
Optical Specifications for the Optical ILA | 48
For More Information