Handling; Installation; Mounting Location; Mounting Methods - Siemens SIGMAGYR RVP540 Basic Documentation

Heat energy manager
Hide thumbs Also See for SIGMAGYR RVP540:
Table of Contents

Advertisement

Siemens Building Technologies
HVAC Products
2

Handling

2.1 Installation

2.1.1 Mounting location

The ideal mounting location is a dry space, such as the boiler room.
The permissible ambient temperature is 0...50 °C.
When the mounting location is selected, the RVP540 / RVP550 can be fitted in one of
the following ways:
• In the control cabinet, on an inner wall or on a DIN mounting rail
• On a panel
• In the front of the control cabinet
• In the sloping front of a control desk

2.1.2 Mounting methods

The RVP540 / RVP550 is designed for 3 different mounting methods:
• Wall mounting: The base is secured to a flat wall with the help of 3 screws.
• Rail mounting: The base is fitted to a DIN rail.
• Flash panel mounting: The base is inserted in a cutout measuring 92 x 138 mm
(+1 mm / −0 mm). The maximum thickness of the front panel is 3 mm.
2.1.3 Installation
• The cable lengths should be chosen such that the control panel door can be easily
opened.
• Cable strain relief must be ensured.
• The measuring circuits carry extra low-voltage.
• The connecting lines from the controller to the actuating devices and pumps carry
mains voltage.
Detector cables should not be run parallel to mains cables (e.g. cables powering the
pump).
Basic Documentation RVP540 / RVP550
Handling
21/348
CE1P2488en
18.10.2002