107 mm
7) The machine must be placed in a well ventilated area. It is important to make sure,
however, that the machine is not near the air vent (for suction) of the room.

2.1.2 Before Starting the Work (120V)

1-1 Points to Make Before Installation
Be sure to go through the following before starting the work:
1) If you are installing the machine after moving it from a cold to warm location, be sure to
leave the machine unpacked for at least 2 hours so that the machine is fully used to the
site temperature, thus avoiding image faults caused by condensation. (The term
"condensation" refers to the formation of droplets of water on the surface of a metal
object brought in from a cold to warm place, i.e., as the result of the rapid cooling of the
moisture (vapor) around the object.)
2) The machine weighs a maximum of about 80 kg(including a DADF). Be sure to work in
a group of 4 persons when lifting it.
1-2 Checking the Contents
Check to be sure that none of the following contents is missing:
100 mm min.
1,983 mm
2,091 mm
F-2-4
Chapter 2
0008-3397
2-3