Points To Note About The Scheduled Servicing - Canon imageRUNNER 2270 Service Manual

Hide thumbs Also See for imageRUNNER 2270:
Table of Contents

Advertisement

5) Clean the copyboard glass and the reading glass.
6) Make test copies.
7) Make sample copies.
8) Check the operation of the leakage breaker.
While the machine is supplied with power (power switch ON), press the test switch of the
leakage breaker to see if the breaker operates normally (i.e., the lever will shift to OFF to
cut off the power).
If the leakage breaker fails to operate normally, replace the breaker, and make a check once
again.
<Resetting>
When you have checked the operation of the leakage breaker, turn off the power switch,
shift the lever to ON, and turn on the power switch.
9) Put the sample copies in order, and clean up the area around the machine.
10) Record the latest counter readings. At this time, be sure to also record the settings of the
following: 'FX-UP-RL' and 'DV-UNIT-K'.
11) Fill out the form in the Service Book, and report to the person in charge. be sure also to
indicate the check on the leakage breaker in the history of checks.

12.3.4 Points to Note About the Scheduled Servicing

- If you used solvent, be sure that it has dried before putting the part back into the machine.
- Unless otherwise indicated, do not use a cloth moistened with water.
- Be sure to provide scheduled servicing at specific intervals.
Chapter 12
0007-5177
12-11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Imagerunner 2870Imagerunner 3570Imagerunner 4570

Table of Contents