Tools and test equipment
The following test equipment and tools are recommended for all new Message Networking installations.
Test equipment
Use the following test equipment when you install a system:
A volt/ohm meter.
!
Two telephones that are connected through the switch or Private Branch Exchange (PBX), if the
!
Message Networking system requires analog. The two test telephones must be placed so that you can
easily see the monitor while you are using them.
Tools
You should have the following tools on site to successfully install a new system:
A medium-width flat blade screwdriver
!
A No. 2 Phillips screwdriver
!
A small pair of needle nose pliers
!
A small pair of wire cutters
!
A sharp, pointed instrument such as a ballpoint pen
!
Caution! Do not use the point of a lead pencil. The graphite can damage a circuit card and cause problems
such as electrical shorts.
Initial PBX and LAN administration
The following PBX and LAN administration must be completed by the customer before or during a new Message
Networking installation.
Initial PBX administration
If the Message Networking system must support analog, the following administration must be performed on the
PBX before you
perform the switch administration
1. Define the extensions to the Message Networking analog ports as 2500 (analog) sets.
2. Define a hunt group that includes all of the extensions you defined in Step 1.
In addition, when you install a new Message Networking system, the switch administration must support the
following situations:
You must be able to test each channel connected to the Message Networking system before assigning
!
the channels to Message Networking or another application. During this testing, you must be able to call
each channel individually using the ChanTran option.
You must be able to test the Message Networking system with two test subscribers.
!
To use analog ports, a hunt group must be assigned with a number of stations, in the right order, equal to
!
the number of analog ports that you require for Message Networking. The pilot number of the hunt group
must be DID and must be restricted.
Before you arrive on site, all of the initial switch administration must be complete unless otherwise specified by
contract. Verify that this initial switch administration is complete before you begin work on the Message
Networking system.