Avaya S3210R Manual page 5

Message networking help
Table of Contents

Advertisement

9.
Unpack the
system.
10.
Identifying the server
and
components.
11.
Place the chassis in
the designated
operating area.
12.
Install the UPS and
optional
EBMs.
11.
Installing the
server.
Complete installation tasks:
12.
Power up the
system.
13.
Log into the system
from the
console.
14.
Set the time and
date.
15.
Install additional
language software
16.
Install the switch
connection
software.
17.
Check the system
status.
18.
Configuring the
modem/terminal.
19.
Set up network
addressing.
20.
Reboot the
system.
Installation area requirements
!
Power requirements
!
Grounding requirements
!
Open boxes as instructed to
S3400-H and S3210R
This includes:
Attaching the front bezel
!
Installing the S3400-H or S3210R in a rack-mount
!
or stackable setup
Connecting the power cables
!
Connecting the port boards
!
Connecting the monitor, keyboard, and mouse
!
Connecting the Message Networking to the LAN
!
Connecting the modem
!
Connecting the RMB
!
Reboot the system now to make sure that it is working
correctly. Once the reboot completes, proceed with the
initial system administration.
save packing materials.
(S3400-H)
(S3210R and S3210)
(S3400-H)
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

S3400-hS3210

Table of Contents