Step 4
Follow the figure below to ground the parallel UPS units, external battery cabinet(s) and
connected critical loads.
WARNING: 
Before start-up of the parallel units, qualified service personnel must set each
UPS's 'Parallel Group ID' (1 or 2) and 'Parallel ID' (1 ~ 8) through the LCD.
Otherwise, the parallel UPSs cannot be started. Please refer to 7.6.5 Parallel
Setting.
Ultron DPS Series
(Figure 5-45: Grounding Diagram_ Parallel Units)
88