Step 2
For top/ bottom entry, route the user-supplied signal cable (❶) through the snap bushing
(❷), use a cable tie (user-supplied) for each wire mount (❸) to fix the signal cable on the
frame, and connect the signal cable to the REPO dry contacts (❹).
NOTE:
The number of the wire mounts and cable ties shown in the figures are for
reference only. The actual number depends on your on-site application.
(Figure 4-8: 400/ 500/ 600kVA UPS_ Signal Cable Routing-2_ Top Entry)
37