For connection to the REPO dry contacts (and other dry contacts on the communication
interfaces I), please follow the instructions below to route the signal cable (user-supplied).
NOTE:
1. In accordance with National Electrical Codes (NEC), please install a suitable
conduit and bushing for cable protection.
2. Please refer to national and local electrical codes for the acceptable cable size.
3. For top entry, please remove the knockout cover(s) at the top of the UPS before
performing the steps below.
300kVA UPS_ Signal Cable Routing Method (Top Entry Only)
Step 1
Install the snap bushing(s). There are three cable entrances that you can choose to use. The
snap bushings are provided in the accessory package.