NO TE
Installation and Verification Manual
What to do if the Test fails
Always ensure Optical Output Laser LEDs beside ports are OFF while
making/changing optical connections.
1 Check all connections and make sure that the correct
loopback connection is in place for the interface being
checked. Make sure connectors are located in key/notch of
the port connectors to ensure full insertion.
2 Check Transmitter and Receiver are set to the same Signal
Rate and that the correct Laser is On when test is being Run.
3 Press <Smart Test> then select Shortcuts > Signal Power
and check the Received signal level is in the Green BER
measurement power range.
4 Ensure all optical connections are clean and fully connected
with no sharp bends or twists in the optical patch cord.
Check the Optical Cord and Attenuator, if damaged
substitute with equivalent.
5 Power down unit and use recognized cleaning kit to clean
connectors before retrying the Tests.
If the problem persists then contact your local Agilent
Sales/Service representative.
Installation (Getting Started)
2
45