FP2 S−LINK Unit
Operation
5.1

Starting Operation

5.1
Starting Operation
When starting up the main unit (FP2), always turn on the main power supply to the
S−LINK (the external power supply) first (or turn both power supplies on at the same
time).
2 Main unit (FP2)
1 S−LINK main
power supply
power supply
If a local power supply is being used for I/O devices connected to the system and for
S−LINK I/O devices, make sure the local power supply is turned on before the S−LINK
main power supply (or turn both power supplies on at the same time).
(brown)
(blue)
3 Main unit (FP2)
2 S−LINK main
1 Local power
power supply
power supply
supply