Operation
5.1
Starting Operation
If using the booster local power supply, start up the booster before the S−LINK main
power supply.
3 Main unit (FP2)
power supply
5 − 4
(brown)
2 S−LINK main
power supply
(blue)
1 Booster local
power supply
FP2 S−LINK Unit