Ending Operation - Panasonic S-Link FP2 Manual

Programmable controller
Hide thumbs Also See for S-Link FP2:
Table of Contents

Advertisement

FP2 S−LINK Unit
5.2

Ending Operation

When turning off the power supply to the main unit (FP2), always turn off the main unit
power supply before turning off the S−LINK main power supply.
If using a local power supply, always turn off the power supplies in the following
sequence: main unit → S−LINK main power supply → local power supply (or turn off the
main unit → S−LINK main and local power supplies at the same time).
If using the booster local power supply, turn off the power supplies in the following
sequence: main unit → S−LINK main power supply → booster local power supply (or turn
off the main unit → S−LINK main and booster local power supplies at the same time).
Note
When turning off the power supplies, any S−LINK devices being
run from a local power supply will stop operating when the local
power supply is turned off, and this causes a disconnection error.
Operation
5.2
Ending Operation
5 − 5

Advertisement

Table of Contents
loading

Table of Contents