FP2 S−LINK Unit
1.1

Features

Two methods of wiring may be employed, depending on the application: standard wiring
or loop wiring.
Example:
Standard wiring
In this method, wiring is done from the control section using
an S−LINK exclusive flat cable and an end hook−up connector
is connected at the end of the main cable. The maximum cable
length is 200 meters (400 meters if a booster is used).
Control section
Example:
Loop wiring
The S−LINK exclusive flat cable from is run from the controller,
and the end is connected back to the controller. The loop can
have a maximum length of 200 meters. The end connector is
connected at approximately the mid−point of the loop (the
position furthest from the S−LINK unit). Even if the main
signal/power line is broken at one point, the system does not
go down and signal transmission continues.
'T'−branch hook−up
connector
S−LINK exclu-
'T'−branch hook−up
sive flat cable
connector
Maximum length: 200 m (400 m when a booster is used)
S−LINK I/O device
Selecting the Right Equipment
1.1
S−LINK I/O device
Branch
cable
'T'−branch
hook−up
connector
End hook−up
connector

Features

End
hook−up
connector
next page
1 − 3