5.1.2 Procedures before Starting Operation

Procedures following installation and wiring and before starting operation are as follows.
1. Powering on
(1) Before powering on, carry out a check referring to "5.1.1 Check Points".
(2) After powering on, check that the POWER LED (Blue) and PROG. LED (Green) are ON
on the CPU unit. When a power supply unit is to be used, check that the power supply
unit's POWER LED is ON.
2. Entering a project
(1) Create a project using the programming tool software.
(2) Use the programming tool's "total check function" to check for syntax errors.
3. Checking output wiring
Use the forced I/O function to check the output wiring.
4. Checking input wiring
Check the input wiring by using the input display LEDs or the monitoring function of the
programming tool.
5. Trial operation
(1) Set the mode switch to "RUN" and check that the "RUN" LED is turned on.
(2) Check the sequence operation.
6. Debugging
(1) If there is an error in the operation, check the project using the monitoring function of the
programming tool.
(2) Correct the project.
7. Saving the project
Save the created project.