INSTALLATION PROCEDURE (for Machine Code: A110/A111)
[A]
[C]
[A110 copier]
[E]
[D]
[L]
14. Set the clamp [A] between the last two binders [B] of the DF harness [C]
as shown (1 screw [27]).
15. Connect the optics fiber cable connector (2P/Black) [D] to CN133 on the
main board [E].
16. Connect the dc harness connector (4P/White) [F] to the optional harness
connector [G] equipped with the power supply unit (A110 copier only).
17. Connect the dc harness connector (4P/White) [H] to CN134 on the main
board (A111 copier only).
18. Disconnect the connector [I] (3P/Brown) from the platen cover position
sensor connector [J], then connect the connector [I] to the connector [K]
of the DF harness (A111 copier only).
19. Secure the grounding wire [L] (1 screw and toothed washer).
[A111 copier]
[J]
[I]
[I]
[K]
[F]
[G]
[D]
[L]
30
1 May 1993
[B]
[E]
[H]