Installation Checklist - Avaya CallPilot 201i Hardware Installation

Hide thumbs Also See for CallPilot 201i:
Table of Contents

Advertisement

Preparing for installation

Installation checklist

The following checklist identifies the steps required to install the 201i server and peripheral
devices. For more details, see
107.
Warning:
Risk of personal injury and hardware failure
The power outlets used by the CallPilot server and its peripheral devices must be connected
to the same ground reference as the one used by the Meridian 1 switch or Communication
Server 1000 system with MGate cards (NTRB18CA) connected to the CallPilot server. If this
requirement is not met, power transients can cause personal injury and hardware failure.
Step
1
2
3
4
®
30
Avaya CallPilot
201i Server Hardware Installation
Connecting peripheral devices to the 201i server
Ensure that you have reviewed the "Installing CallPilot" section
in the CallPilot Installation and Configuration Task List and
completed stage 1 of the "Installation checklist."
This includes the following tasks:
Unpack the server, and ensure you have all the items you
need (see
Unpacking and inspecting the 201i server
page 32).
Complete the following checklists that are provided in the
CallPilot Installation and Configuration Task List:
- "CallPilot software media and documentation checklist"
- "CallPilot server hardware checklist"
Inspect the server for any damage that might have occurred
during shipping (see
Unpacking and inspecting the 201i
server
on page 32).
Familiarize yourself with the
requirements
on page 34 of this guide.
If you are installing the 201i server into a Meridian 1 tiered
system, do the following:
• Change the location of the secondary backplane (DS30X)
connector on the 201i server (see
secondary backplane connector
• Replace the existing backplane (tip and ring) cable on the
Meridian 1 with the one supplied with the 201i server
(NTRH3501) (see pages
ring) cables
on page
44-What is next?
Install the intermediate SCSI cable. This cable connects the
external CD-ROM or tape drive.
• For Meridian 1, you require two cables to complete the
connection between the 201i server and the SCSI device:
Description
Switch and network
Repositioning the
on page 39).
Removing the backplane (tip and
on page 50).
on page
Check
on
December 2010

Advertisement

Table of Contents
loading

Table of Contents