Commissioning

7.2 Checklists for commissioning

7.2
Checklists for commissioning
Note
Required checks
The lists below do not claim to be complete. It may be necessary to perform additional
checks and tests appropriate for the situation specific to the particular system.
Before commissioning the system, check that it is properly mounted and connected.
Commission the drive system according to the operating instructions of the converter or
inverter being used.
Checklists for commissioning 1FE1 motors
Thoroughly familiarize yourself with the safety instructions and observe the checklists below
before starting any work.
Table 7- 1
Are all of the necessary components of the configured drive line-up available, correctly
dimensioned, installed and connected?
Is the manufacturer documentation for the system components (e.g. drive system,
encoder, cooling system, brake) and the "SIMOTICS M-1FE1 built-in motors" Configu-
ration Manual available?
If the 1FE1 motor is to be operated on the SINAMCIS S120 drive system:
Is the following, current SINAMICS documentation available?
If the 1FE1 motor should be operated on the SINAMCIS S120 drive system:
Was the Chapter "Checklists for commissioning SINAMICS S" in the SINAMICS S120
Commissioning Manual carefully observed?
Is the motor type to be commissioned known?
(e.g. 1FE1 _ _ _ – _ _ _ _ _ – _ _ _ _)
Are the environmental conditions in the permissible range?
122
Checklist (1) - general checks
SINAMICS S120 Commissioning Manual
Getting Started S120
S120 Function Manual
S120/150 List Manual
Check
Hardware Installation Manual, 12/2016, 610.43000.40b
OK
1FE1 synchronous built-in motors